Engine Transfer
![Engine Transfer](https://storage.googleapis.com/ghost-944restore/content%2Fimages%2F2023%2F11%2Fengine-stand.jpeg)
Now that the engine was out of the car, it was time to load it up on the engine stand.
Remove Clutch and Flywheel
I was able to hold the pressure plate with my left hand and break the allen bolts with a breaker bar.
![](https://storage.googleapis.com/ghost-944restore/content%2Fimages%2F2023%2F11%2Fclutch-pressure-plate.jpg)
The flywheel was a bit more challenging. I ended up locking the flywheel using a breaker bar and some bolts inserted into both the engine block and the flywheel.
![](https://storage.googleapis.com/ghost-944restore/content%2Fimages%2F2023%2F11%2Fclutch-flywheel.jpg)
Engine Transfer
With the clutch components off, I was ready to transfer the engine from the hoist to the stand. I used 12x1.5 100mm bolts to connect the stand to the block.
![](https://storage.googleapis.com/ghost-944restore/content%2Fimages%2F2023%2F11%2Fengine-stand-bolts.jpg)
![](https://storage.googleapis.com/ghost-944restore/content%2Fimages%2F2023%2F11%2Fengine-transfer.jpg)
![](https://storage.googleapis.com/ghost-944restore/content%2Fimages%2F2023%2F11%2Fengine-on-stand.jpg)